HARJGTHEONE 6-20-2019 HYMEN block

Good morning HARJGTHEONE on 6-20-2019 showing concrete wall between building 13 and building 14 is now open activating the 11-34 but there is a locked door however you can see building 14 through opening under the door. Why is door locked? It needs to be open to do work. Signs say it’s getting ready to open, much like the hymen it takes some time to break open, thus the 11-34 is a virgin signs say or one not used much. 😀(at Grosvenor Ambleside)
Back to Top