Woltman/PVE Piling recently introduced their new 50 ton pile driving rig. This rig is equipped with Zollern free fall winches.
On the above showed project it had an average production rate of 50 piles a day using a PVE 5NL hydraulic impact hammer.
PVE already offered a 30 ton and 40 ton pile driving rig with free fall winches but has now extended its range to 50 ton.
1 view
69
22
7 months ago 00:12:18 1
Woltman 50PR FF in Washington DC
7 months ago 00:01:18 1
Woltman 50 PR-FF with PVE 4-6NL driving piles in Washington DC x16 speed