Energean Power FPSO mooring lines installation, Karish field, Israel!

The 14 mooring lines were pre laid and wet stored prior to the Energean Power FPSO arrival. Post FPSO arrival the 14 mooring lines shall be lifted and connected to the FPSO.
Back to Top