How to install cork flooring

How to install cork flooring Acclimate the Flooring Prior to installing cork flooring, you must allow the cork floor to sit in the space for 72 hours. Indoor living temperatures must be maintained before during and after installation between 15 and 24 Celsius (or 58 to 75 Fahrenheit). Consistent indoor Relative Humidity must be maintained between 45 and 65 %. Vapour Barrier 6mil polyethylene sheeting is used over concrete subfloors. The seams are overlapped by 6 to 8 inches and taped closed using moisture resistant tape. Assessing Floor Level Using a 4ft or 10ft straight edge, assess the level of flatness in the subfloor. Cork floating floors require a flatness quotient of 3mm over 3 meters or 1/8 inch over 10 ft. Glueless Install cork flooring Forna cork flooring utilizes the Uniclic profile. It does not require the use of adhesives, nails or screws during the laying process. Baseboards Added After Cork Floor Installation Ideally the baseboards and trim are added af
Back to Top