Concrete Pouring Construction Of Neighboring House Went Wrong And Flowed Into My Sofa Through Window

The concrete pouring during the construction of the neighboring house went wrong and spilled out of the formwork. It just flowed into someone else’s house through the adjacent window and happened to land on the sofa ! “Formwork displacement“ is a term in construction. It refers to the deformation and displacement of the formwork during the process of concrete pouring due to various reasons (such as unstable support, loose formwork splicing, excessive lateral pressure of concrete, etc.), resulting in the concrete exceeding the predetermined pouring range and affecting the size and shape accuracy of the components ! This situation is indeed quite troublesome. The formwork displacement led to the concrete flowing into others’ houses and dirtying the sofa, which not only caused property damage to the neighbors but also might trigger conflicts and disputes between them ! From the perspective of responsibility, the party building the house should bear the main responsibility for the formwork displacement caused by improper construction. They need to actively negotiate with the affected neighbors on compensation and cleaning matters to restore the neighborhood relationship as much as possible ! For the affected party, when dealing with this matter, they should remain calm and rational, and solve the problem through friendly negotiation to avoid further intensification of the conflict !
Back to Top