Orange Train Lahore | Metro Train Travel in Lahore | SheikhBaig studio

Notable FEATURES OF PROJECT Length = KM (Cut and Cover Section = KM; Elevated = 25.4 KM) Elevated Viaduct = U Shape Girders Stations = 26 (Elevated = 24; Underground= 2) Rolling Stock = 27 Train sets ( 5 Cars /train set=135) Depot at Dera Gujran (Operation Control Center, workshops with the overhauling facility, training center, parking facility) Stabling Yard at Ali Town (Washing facility, minor repair facility, parking facility) Travelers from the Orange Line will have the option to utilize An
Back to Top