BridgeView, Episode 17: Stressing the permanent cables

In the final part of our series on the Portland-Milwaukie Light Rail Bridge’s permanent cable system, John Lozner, of Kiewit Infrastructure West, discusses the permanent cable stressing process used to support the bridge’s deck. This is the third of three episodes about the cable-stay system and how it is installed on the bridge.
Back to Top