Giga Berlin | 2022-01-14 | Even more Model Y

Even more Model Y Performance are parking lot (10:00) at Tesla’s Gigafactory Berlin-Brandenburg and you can also see some of them driving around the factory (0:40, 7:22, 7:40, 15:15) Placing curbs in the south-west parking lot is almost completed (0:20) and topsoil is placed in the western infiltration basin (3:33). A lot of rebar was placed on the roof of the lobby (4:08) and another stairwell is getting graffiti artwork (5:25). More roof and floor work on the waste water treatment building (7:07), the road in front of the casting section is getting paved with asphalt (7:20, 16:50). Concrete is poured at the top floor for the cell production building (18:50, 22:30), and a lot more beams have been placed in the formation section (19:45). More floor panels are also installed (20:00), and half of the formation section got a roof now (23:40). The trailer yard got the first road markings (25:50), and the pipe from the pump station to the northern infiltration basin is completed (26:35). If you want to support me